![]() |
| Paintjob is finished and the floor looks great if I can say so myself |
![]() |
| Doing some light marble faux painting on the tiles |
![]() |
| Dried and complete. Looks just like I imagined. |
![]() |
| All areas is covered, walls and the inside of the vaults |
![]() |
| Mixing plaster with pigments |
![]() |
| Cover the areas where the panels will be with tape |
![]() |
| The walls will be coated in pigmented plaster |
![]() |
| Time to focus on the walls |
![]() |
| Most of the panel is built |










Inga kommentarer:
Skicka en kommentar